The roll-out of electric vehicles comes with growing obligations on charging infrastructure. Developers, local authorities and building managers must now equip or pre-cable their car parks, or fall behind both the regulations and users' needs.
Pre-cabling and installation
The regulations distinguish two levels. Pre-cabling means installing the ducts, cable trays and boards needed to make it possible to add charge points later, at lower cost. Installation means putting in actual charge points. Depending on the type of building and the size of the car park, one or the other applies, with specific thresholds and deadlines.
Thresholds by car park
Obligations depend on the type of building (residential or not), on whether it is new or existing, and above all on the number of spaces. Above a certain threshold, the car parks of non-residential buildings must have a minimum number of charge points, with a share accessible to people with reduced mobility. The largest car parks are the most affected.
The driving role of local authorities
Beyond their own buildings, local authorities shape the territorial charging network, on public roads and public car parks. They weigh slow destination charging against fast charging, and watch over the network's consistency and accessibility. This planning requires knowing exactly what already exists before deciding where to install.